Omdurman shopfronts: reopen without displacing traders.
Focus on safe shop access beneath an assessed building, affordable repairs and trading continuity.

DOCUMENTED · APR 2026AI future conceptOriginal photo: AP / Bernat Armangue · 23 April 2026.
Photograph sourceCapture dates describe the photographed moment, not current conditions. The future image is an AI adaptation, not an approved design, completed work or endorsement by the photographer or owner.
This is a community planning brief. The photographed site is not enrolled or approved for work. Current surveys, lawful consent, local partners, costs and funding still need to be agreed.
How do we make this happen?
Start with this community
Build a small trader and tenant group, including women-led businesses and informal vendors. Agree temporary pitches, delivery access and a way to resolve rent or occupancy disputes.
Traders choose the first willing shop cluster and the least disruptive work sequence.
A manageable first phase
A short row of willing shops and the shared frontage; trading arrangements come before construction.
The place and its connections
Not surveyed or to scale. A qualified local team must design the actual work.
People we need
- Traders and lawful occupants: agree who benefits and who can consent.
- Structural and electrical specialists: assess the building above the shops and existing services.
- Local repair trades, a site supervisor and a cleaning/maintenance group.
Equipment we need
- Inspection tools and appropriate temporary separation from unsafe areas.
- Masonry, shutter and electrical repair tools used by qualified trades.
Materials to source
- Compatible masonry repair, secure shop doors or shutters and weather protection.
- Paving, drainage grates, inspected wiring and modest shade structures.
The delivery sequence
- 01
Record occupants, livelihoods, consent and temporary trading needs.
- 02
Assess the structure above the shops and the electrical supply.
- 03
Agree repairs and publish prices without assuming new rents or relocation.
- 04
Repair a small frontage while preserving agreed customer and delivery access.
- 05
Inspect, reopen with traders and agree cleaning and repair responsibilities.
What needs pricing
- Building and electrical assessmentsLocal quote required
- Temporary trading and accessLocal quote required
- Shopfront and shutter repairsLocal quote required
- Shared frontage, waste collection and maintenanceLocal quote required
No verified budget or construction date yet. Quotes must include local labour, transport, contingency and continuing maintenance.
How we measure success
- Existing traders can return or continue trading under agreed arrangements.
- Inspected shop access and published repair costs, with complaints recorded.
Evidence to publish
Publish local consent, the current assessment, itemised quotes, inspection results, redacted invoices and the handover plan for this project.
Your knowledge belongs in the plan.
Suggest an improvement, share a drawing or document, offer local knowledge or identify a practical missing piece. Proposals are reviewed before becoming public; they do not directly overwrite the project plan.
Join the project conversation
Sign in or create an account to submit proposals and track review. You can read the full project without an account.
Community proposals & discussion
No reviewed contributions yet. Be the first to improve this project.
Submit → moderation → technical and community review → a documented design revision. Publication means the contribution passed moderation, not that it is an approved engineering design.
Track your submissions ↗